Solutions | Products  |  Services |  Projects | Partner Ship | About Informatics | Careers
 |  HOME   | PRODUCT |  RHNP.NET



RHNP.NET(RATIONALIZATION OF  HOUSE NUMBERING PROJECT)

_____________________________________________________

Informatics India has developed a Software Solution for Rationalized House Numbering Project (RHNP.NET). It maintains the database of Wards, Locations, Streets and House Holds along with the 14 column correlation data. It has features for Entry, Verification and Approvals, which ensures the quality of an authenticated Database. 

                                                                       

RHNP.NET   creates a House Numbering Cell ,Provide Infrastructure, engage Task Force, conduct the House Hold Survey and launch the Project.

This Product has Administrative and Technological aspects involved in it.   Administrative aspects involve setting up House Numbering Cell, identifying the task force, procuring base maps, providing infrastructure, Set targets, supervise the work force, check the work quality, take responsibility for the quality and report the progress to the required Officers / places. And the Technological Aspects include, Digitalization of base Maps, Generation of locality wise scaled maps, use the nhnp.net software to handle, Verify and Approve the items in the database to generate Rationalized House Numbers, correlation data and the related outputs.

 . RHNP.NET  is developed using Microsoft Visual Studio.NET. The back end can be any RDBMS, such as Oracle, MS-SQL Server, Sybase or MS-Access. And Crystal Reports 10 is used for report creation.

Different  Stages  of  RHNP.NET  are as follows:

 

STAGE I: 

A) DIGITALIZATION OF BASE MAPS: Informatics India will digitalize the base maps to the Vector Formats and generate Locality wise scaled drawings. These drawings will be used to update with the latest survey data of new and modified House Holds B) INSTALLING RHNP.NET SOFTWARE

STAGE II:

ORGANIZING HOUSE HOLD SURVEY

A) Identification of localities B) identifying and numbering the streets C) rhnp - infrastructure requirement   D) training the survey team   E) batch control slip

                               

STAGE III:

DATABASE AND MAPS UPDATION

Using rhnp.net software for database creation & updation; updating Autocad drawings; generating and assigning rationalized house numbers. The steps involved are,

A) House Hold Database Creation and Updating,   B) Verification of Survey Data in the database,  C) Authentication of House Hold Survey Data,  D) Updating AutoCAD Drawings, E) Checking and passing the detailing and quality of the Drawings and  F) Generating and Assigning Rationalized House Numbers.

STAGE IV:  

CREATION OF LOCALITY WISE FINAL DRAWINGS:

After updating the drawings, The Consultants will take up shaping them with streetwise color schemes and boundary definitions as per the scale. This would be the final phase of the Project for a Locality. TOP

 

If you're interested to know  further details or if you have any queries  then mail us to info@informaticsindia.com